A Report Field Visit to 400MW Solar Power Project on 10-09-2023.

A Report Field Visit to 400MW Solar Power Project on 10-09-2023.

Date: 10/09/2023

Students of III year EEE have visited 400MW Solar Power project on 10th September, 2023. They have experienced the practical approach of how the power is generated in the plant and what all are the precautions taken over for their safety and visited each and every section with the help of Executive Engineer, 400MW Solar Power project. And students rewind their knowledge in the subject which they have undergone theoretically in their III year. Some of the pictures during the visit are attached.